ADU Cost Calculator — Free Instant Estimate | FindADUPros.com
Free Tool · Updated 2026

How Much Does an ADU Cost?

Get an instant, location-adjusted estimate for your Accessory Dwelling Unit project — including permits, design, and construction.

±15%
Accuracy
50
States Covered
5
ADU Types
Free
Always
150 sq ft1,200 sq ft
📋

What's Included

Estimates cover permits, design fees, foundation, framing, MEP systems, and finishes. Site work not included.

📍

Regional Pricing

Costs are adjusted for labor rates and permit fees in your state. California and Hawaii have the highest costs.

⚠️

Not Included

Utility upgrades, major grading, septic systems, and landscaping can add $5,000–$30,000 to your project.

🔄

Get Real Quotes

This calculator gives estimates. Always get 3+ quotes from licensed ADU contractors in your area.

ADU TypeLow EndHigh EndAvg per Sq Ft
Detached ADU$180,000$400,000+$280–$450
Attached ADU$140,000$300,000$220–$380
Garage Conversion$60,000$180,000$100–$250
Junior ADU (JADU)$30,000$100,000$80–$180
Prefab ADU$150,000$350,000$250–$420
Basement Conversion$80,000$200,000$150–$280

Frequently Asked Questions

How accurate are these ADU cost estimates?
Our estimates are based on real construction data and updated for 2026. They are typically within ±15% of actual project costs. Final costs depend on site conditions, contractor rates, and material choices at the time of construction.
Are permit fees included in the estimate?
Yes. Our estimates include typical permit fees scaled to your region. However, some cities have unique requirements that can add costs. Always confirm current permit fees with your local building department before budgeting.
What is the cheapest type of ADU to build?
Garage conversions and Junior ADUs (JADUs) are consistently the most affordable ADU types. Garage conversions typically cost $60,000–$180,000 because the existing structure reduces new construction requirements. JADUs created within existing home space can cost even less.
How much does an ADU add to my property value?
Most real estate professionals estimate that a well-built ADU increases property value by 20–30% of the construction cost. In high-demand markets like Los Angeles, San Francisco, and Seattle, the value increase can be higher due to strong rental markets.
What is not included in these estimates?
Site-specific costs like utility connection upgrades, significant grading or excavation, tree removal, septic system expansion, and landscaping restoration are not included. These can add $5,000–$30,000 or more to your total project cost depending on your property.
How do I find a reliable ADU contractor?
Always verify a contractor's state license and insurance before hiring. Get at least 3 quotes, check references from completed ADU projects in your city, and never pay more than 15% upfront. Use FindADUPros.com to find and compare licensed ADU contractors in your area.
Total Estimated Cost
$0
— per sq ft
Cost Breakdown
Base Construction
Permit Fees
Design & Plans
Foundation Upgrade
Included
Contingency (10%)
Total Estimate
💰 Rental Income Estimate
Est. Monthly Rent
Annual Income
Est. Payback Period

Estimates are for budgeting purposes only and may vary by ±15% based on site conditions, contractor, and timing. Always get 3+ quotes from licensed contractors.

How to Use This ADU Cost Calculator

Our free ADU cost calculator gives you an instant, location-adjusted estimate for your accessory dwelling unit project. Simply select your state, choose your ADU type, adjust the square footage, and pick your preferred finish level. The calculator updates in real time, showing you a detailed cost breakdown including base construction, permit fees, design costs, and a contingency buffer.

What Affects ADU Construction Costs?

ADU costs vary enormously depending on your location, the type of ADU you're building, and the complexity of your site. Labor costs in California are 40–60% higher than the national average, which is why the same ADU that costs $200,000 in Texas might cost $350,000 in Los Angeles. Finish level is another major variable — choosing premium finishes over basic ones can add $40,000–$80,000 to a standard detached ADU.

Site conditions that aren't reflected in this calculator — such as steep slopes requiring significant grading, aging utility connections that need upgrading, or mature trees in the construction footprint — can add $10,000–$50,000 to your project. Always have a licensed contractor assess your site before finalizing your budget.

ADU Cost by State

Construction costs vary significantly by state due to differences in labor rates, material costs, and permit fee structures. California, Hawaii, New York, and Washington consistently have the highest ADU construction costs in the country. States like Texas, Arizona, Georgia, and Tennessee tend to have lower construction costs due to lower labor rates and more streamlined permitting.

Scroll to Top